T12025 Systems Analysis and Design Assignment Help

Group Assignment

Assessment Details and Submission Guidelines
TrimesterT12025
Unit CodeSystems Analysis and Design
Unit TitleHI5030
Assessment TypeGroup Assignment
Due Date +time:

24/04/2025

11.59pm

Weight40%
Submission Guidelines
  • All work must be submitted on Blackboard by the due date along with a completed Assignment Cover Page.
  • The assignment must be in MS Word format unless otherwise specified.
Academic Integrity InformationHolmes Institute is committed to ensuring and upholding academic integrity. All assessments must comply with academic integrity guidelines. Please learn about academic integrity and consult your teachers with any questions. Violating academic integrityisseriousandpunishablebypenaltiesthatrangefromdeductionofmarks, failure of the assessment task or unit involved, suspension ofcourse enrolment, or cancellation of course enrolment.
Penalties
  • All work must be submitted on Blackboard by the due date and time, along with a completed Assessment Cover Page. Late penalties apply.
  • 20%penalty applicable for solo(single student)group submissions.
  • Your answers must be based on Holmes Institute syllabus of this unit. Outside sources may not amount to more than 10% of any answer and must be correctly referenced in full. Over-reliance on outside sources will be penalised
  • Reference sources must be cited in the text of the report and listed appropriately at the end in a reference list using Holmes Institute Adapted Harvard

    Referencing. Penalties are associated within correct citation and referencing.

Group Assignment Guidelines and Specifications

Assignment Title: Optimizing Business Processes through Information System Design

Assignment Overview:

You have been provided a list of case studies that your group should select one of them. You can find this in the Group assignment case studies.pdf.In this Assignment ,your group will focus on identifying in efficiencies in one of these. business's existing processes and designing an information system to optimize these processes. The goal is to create a system that improves operational efficiency, reduces costs, or enhances service delivery.

Assignment Tasks and Deliverables:

  1. Group Formation:
    • Form groups of 4 students.
    • Assign roles: Project Manager, Business Analyst, System Architect, Data Modeler, and(if needed) Prototype Developer.
  2. Task 1:Business Process Analysis and Requirements Gathering:
    • Business Analyst: Identify a business with operational in efficiencies and conduct research to gather system requirements.
    • Project Manager: Oversee the research process, ensuring that all relevant stake holders are interviewed, and all necessary data is gathered.
    • Deliverable:
      • Introduction to the selected project and system description
      • Objectives of project
      • Requirement specification(functional and non-functional)and constraints
      • Description of the proposed system
      • Logical model design
        • Data flow diagrams-Context diagram
        • Data flow diagrams-Diagram0/Diagram[Diagram1 is optional]
        • Data dictionary for all the data stores in level 0DFD and any 3selected data flows of your choice.
      • You should identify atleast 3 inefficiencies and gather 4 requirements.
  3. Task  2:Process Modelling and System Design:
    • System Architect: Design process models(e.g.,Data Flow Diagrams, Use Case Diagrams) based on the requirements gathered.
    • Data Modeler: Develop data models(e.g., Entity-Relationship Diagrams)to represent the data flow and storage needs of the system.
    • Deliverable: process models ,data models, and an initial system architecture.
      • Object Oriented Modelling Use a suitable UML diagramming software such as Visual Paradigm (community edition) or Lucid charts to model the following diagrams of your selected project. Hand-drawn diagrams or diagrams developed using office Suits are not accepted. Based on your project requirements, you may include the entire model in one diagram or subdivide the model into several subsystem diagrams.
    • Use case diagrams

      • Activity diagrams–select atleast 2 main use cases from your project and develop activity diagrams
        • Class diagram
          • System sequence diagrams-select atleast 2 main use cases from your project and develop system sequence diagrams
        • User Interface Design an overall user interface consisting of screens, commands, controls ,and features to enable users to use the system. Choose atleast 4 main functionalities of your project to develop user interfaces. Your design should Demonstrate how data will be input to the system? That includes the physical layout for input, the input design and procedures, and how data will be output from the system. Use suitable wire framing software such as Lucid Charts online wireframe tool, Balsamiq Wireframes, or figma.com to design your interfaces.

      4.Task 3:System Architecture and Proto typing:

      • System Architect: Finalize the system architecture, detailing how different components of the system interact.
      • Prototype Developer: Create a basic proto type or mock-up of the system, focusing on key interfaces and functionalities.
      • Deliverable: The finalized system architecture, prototype screenshots ,and design documentation.

        • Atleast one screenshot for each requirement identified.

         

Example invalid form file feedback

Join our 150К of happy users

Get original papers written according to your instructions and save time for what matters most.